دوره 4، شماره 1 - ( بهار و تابستان(شماره 1و2 ) 1386 )                   جلد 4 شماره 1 صفحات 10-14 | برگشت به فهرست نسخه ها

XML English Abstract Print


دانشکده بهداشت دانشگاه علوم پزشکی ارومیه
چکیده:   (6835 مشاهده)

  Background and Aims

  Permit to work (PTW) system as an operational control methods, is an accepted system for control of maintenance activities hazards in chemical industries. The main objective of this study was degree of conformity analysis between existing situation of PTW system and audit criteria.

  

  Methods

  In this cross - sectional study, PTW system was audited in an oil and gas extracting   industry by checklist.

  

  Results

  Major nonconformities include outdating of system legal and regulation, non existence of permit for majority of dangerous activities, unidentified training needs, incomplete  identification and risk assessment of maintenance hazards before doing them, unspecified

  inspection and survey frequencies during works and nonexistence of scheduled auditing for the system.

  

  Conclusion

  PTW audit results showed that there is a noticeable gap between audit criteria and  audit evidences. So that the examined system had nonconformities in all of the checklist sections system, training and competency, permit, coordination and monitoring.

 

متن کامل [PDF 331 kb]   (2576 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: میکرو ارگونومی
دریافت: 1390/5/10 | انتشار: 1386/1/26