Iran Occupational Health Journal
سلامت كار ايران
ioh
Medical Sciences
http://ioh.iums.ac.ir
136
journal136
1735-5133
2228-7493
10.61186/ioh
fa
jalali
1395
12
1
gregorian
2017
3
1
13
6
online
1
fulltext
fa
ارائه یک الگوی کاربردی برای ارزیابی عملکرد HSE پیمانکاران ساخت و ساز
Presentation of a practical framework for performance assessment of HSE in construction contractors
HSE
HSE
پژوهشي
Research
<p dir="RTL"><a name="OLE_LINK21"></a><a name="OLE_LINK20"><strong>زمینه و هدف:</strong></a> ارزیابی عملکرد نظام مدیریت <span dir="LTR">HSE</span> پیمانکاران یک مرحله کلیدی در فرایند مدیریت پیمانکاران محسوب می­شود و پایه­های بهبود مستمر را تشکیل می­دهد. لذا هدف پژوهش کنونی ارائه یک الگویی کاربردی برای ارزیابی عملکرد<span dir="LTR"> HSE </span>سطح پروژه پیمانکاران می­باشد.</p>
<p dir="RTL"><strong>روش بررسی:</strong> در این مطالعه تحلیلی-کاربردی، پس از تعیین فاکتورهای اصلی و شاخص­های مربوط به هر یک از آنها، پرسشنامه مورد نظر آماده شد و سپس فرایند روایی و پایایی پرسشنامه انجام گردید. با استفاده از این پرسشنامه و با نظرسنجی از 3 گروه از خبرگان <span dir="LTR">HSE</span> شرکت، اهمیت فاکتورهای اصلی و شاخص­های آنها مشخص شد. سپس نتایج خروجی نظرات خبرگان بررسی گردید و با کمک فرمول­های مربوطه، اهمیت نسبی فاکتورهای اصلی و شاخص­های آنها محاسبه گردید. برای شکل­گیری الگو، نمره شاخص­های عملکرد محاسبه گردید. در پایان به منظور اعتبار سنجی الگوی ارائه شده، عملکرد <span dir="LTR">HSE</span> سه پیمانکار بزرگ ساخت و ساز یک شرکت فعال در حوزه پتروشیمی مورد ارزیابی قرار گرفت.</p>
<p dir="RTL"><strong>یافته­ ها:</strong> الگوی ارائه شده از 7 فاکتور اصلی و 123 شاخص تشکیل شده است<span dir="LTR">.</span> دامنه نمره کل ارزیابی عملکرد پیمانکار از نظر <span dir="LTR">HSE</span> در سطح پروژه می­تواند بین 80 (عملکرد خیلی ضعیف) تا 400 (عملکرد خیلی خوب) ­باشد. نتایج ارزیابی عملکرد سطح پروژه 3 پیمانکار نشان داد که پیمانکار اول عملکرد<span dir="LTR">HSE </span> خوب و پیمانکار دوم و سوم عملکرد <span dir="LTR">HSE</span> متوسطی دارند.</p>
<p dir="RTL"><strong>نتیجه گیری:</strong> الگوی پیشنهادی می­تواند توسط کارفرمایان سازمان­های بزرگ جهت ارزیابی عملکرد <span dir="LTR">HSE</span> سطح پروژه پیمانکاران خود بکار گرفته شود. همچنین با توجه به نمره خروجی از فرایند ارزیابی عملکرد می­توان پیمانکاران را طبق عملکرد <span dir="LTR">HSE</span> آنها سطح بندی کرد و بعنوان ورودی در انتخاب پیمانکاران برای پروژه­های بعدی استفاده کرد.</p>
<p><strong>Background and Aims: </strong>Performance assessment of the HSE-MS in the contractors is a key step in the contractor’s management process and it forms the basis of continuous improvement. Therefore, the present study aims to develop a practical model for the performance assessment of Health, Safety and Environment Management System (HSE-MS) of construction contractors.</p>
<p><strong>Methods: </strong>In this analytical-practical study, after determining the main factors and indicators related to each of them, the questionnaire was built and then, the process of its validity and reliability were conducted. The importance of the main factors and their indicators were identified by using the questionnaire along with a poll of three groups of HSE experts in a holding company. Afterward, the results of the expert opinions were investigated and the corresponding formulas were used for calculating of the relative importance of main factors and their indicators. The performance indicators score in order to build the model was calculated. At the end, in order to validate the presented model, HSE performance of three large construction contractors in a holding company was evaluated.</p>
<p><strong>Results:</strong> developed model was composed of seven main factor and 123 indicators. Total score of contractor performance assessment in the project level can be a range between 80 (very poor performance) and 400 (very good performance) from the perspective of the HSE. The result of performance assessment in project level of three contractors shows that the <a name="_GoBack"></a>HSE performance of first contractor was good and both second and third contractors were moderate.</p>
<p><strong>Conclusion: </strong>The proposed model can be used by employers of the large organizations to assess their HSE performance of contractors in level project. In addition, with regards to the output of assessing the contractors’ performance, the contractors can be graded according to their HSE performance and was used as an input in the selection of contractors for the future project.</p>
ارزیابی عملکرد, بهداشت, ایمنی و محیط زیست, پیمانکاران, ایمنی, ساخت و ساز
Performance assessment, HSE-MS, Contractor, Safety, Construction
10
22
http://ioh.iums.ac.ir/browse.php?a_code=A-10-1588-1&slc_lang=fa&sid=1
A
dormohammadi
علی
درمحمدی
a.dormohammadi@gmail.com
13600319475328460027106
13600319475328460027106
No
Birjand University of Medical Sciences
دانشگاه علوم پزشکی بیرجند. دانشکده بهداشت
I
Mohammad fam
ایرج
محمدفام
Mohammadfam@umsha.ac.ir
13600319475328460027107
13600319475328460027107
Yes
Hamadan University of Medical Sciences
دانشگاه علوم پزشکی همدان. دانشکده بهداشت
E
Zarei
اسماعیل
زارعی
smlzarei65@gmail.com
13600319475328460027108
13600319475328460027108
No
Hamadan University of Medical Sciences
دانشگاه علوم پزشکی همدان. دانشکده بهداشت