Volume 3, Issue 2 (2006)                   ioh 2006, 3(2): 12-0 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Doshman Fana Yazdy F, Farshad A, ArghamI S, Heidari M. Use of ETBAmethod (Energy Trace and Barrier Analysis) forhazard identification in a paint shop of an automobile production factory. ioh 2006; 3 (2) :12-0
URL: http://ioh.iums.ac.ir/article-1-483-en.html
Abstract:   (11846 Views)

  Background and aims

  Occupational accidents and diseases cost 1.25 thousands billion $ to economic of world & links 2 million annually. Rate of death due to occupational accidents in developing countries in some cases is 4 times to developed industrial countries. To control accidents & resultant damages, identification of potential agents causing accidents in  necessary. One of the modern methods for identification these agents is ETBA. This method is  based on energy model. This model present energy as potential agent causing accident & according  to this, propose a set of control strategies that are in different levels of priority due to their  effectiveness

  Methods

  This research is a case study that is a kind of qualitative researches and it had done in an  automobile factory's paint shop. First in this study ETBA method used to identify hazards, then  risks were analysed and in the last phase, approaches were proposed for decrease level of

  unacceptable risks.

  Results

  This study determined that in this field, two category of hazards are in first priority for   performing control measures:  First category contains chemical hazards that might lead to catastrophic consequences like fire &  cancer. Highest risk portion o this paint shop is manually spray painting booth and spray painting  stations that is placed in repair lines.  Second category contains hazards that causes accidents repeatedly the highest risk portions are stations where ground conveyor moves car bodies (pain and repair lines).

  Conclusion

  Because of these two category of hazards are concentrated in paint and repair lines, these lines should be in first priority for control hazards.

Full-Text [PDF 613 kb]   (3368 Downloads)    
Type of Study: Research | Subject: Micro Ergonomics
Received: 2011/08/13 | Published: 2006/10/15

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Iran Occupational Health

Designed & Developed by : Yektaweb